Location: Alcona County, Michigan

Pipe: 4” Steel – 8.93 miles in length

Transporting: Natural Gas

Design Engineer: Marc Marter

Survey: Porter Survey

Construction: R.L. Morris Construction

Radiographic Inspection: Jan-X

Hawes Pipeline was constructed during the winter of 2008-2009.  The 4″, 1440 psig line carries CO2 laden Natural Gas from Samson Energy to an existing CO2 removal plant in northeastern Michigan.